Deswik.IS

Adding detail to mine planning, simply

Deswik.IS (Deswik Interactive Scheduler) provides the mine planning engineer with all the tools required to produce detailed mine reserves and schedule mining activities. Utilising 3D spatial data (mine designs, survey and geological), the software provides a simple, work flow driven user interface to guide the user through the process of creating a long, short or medium term mine plan for either an open pit or underground mine.

Improving planning quality through continuous assessment using Deswik.IS


Deswik.IS produces a Gantt chart schedule which the mine planner is able to modify and update directly from the graphical environment. This allows the planning engineer to create and update planning activities graphically and have the results updated in the Gantt chart immediately. This facilitates rapid schedule development and allows the mine planner to spend more time analysing planning scenarios rather than manipulating data.

The main features of Deswik Interactive Scheduler include:
  • Simple, process driven reserving routines to generate schedulable tasks from mine design data
  • Model Open Pit and Underground mines in the same project
  • Update and revise mine plans quickly and simply
  • Integrates long, medium and short term plans in one schedule
  • Direct integration with Gantt chart scheduler provides schedule visualisation
  • Open pit reconciliation tools utilising updated survey data
  • Powerful graphic reporting of mine plans and schedules
Deswik Interactive Scheduler user interface